What should a new water theme park pay attention to?

The ultimate goal of a theme park is customer experience. The purpose of tourists visiting a theme park is to have a happy experience, whether it is a land park or a water park, to experience the environment, perform, ride various thrilling and exciting equipment, etc., and ultimately to have a happy experience. This is one of the core guiding concepts of theme parks: to make every visitor to a theme park have a happy experience, which is the ultimate goal of theme parks—to serve customers.
Service training:
High-quality service training is needed to improve the service quality; now, much park service training is missing or is not in place. Some theme park investors pay more attention to the scale of the park, with tall equipment, dazzling landscape packaging, and so on, but ignore the staff's service training.
Personalized: Tourists demand personalized service, and demand is increasingly strong. Each person's needs vary, so the park should be based on the needs of different groups of people and provide personalized services to meet the needs of different groups of people for service experience. Tourists have higher and higher requirements for service experience. How to meet the different personalized needs of each tourist really puts forward higher requirements for tourism practitioners and theme park practitioners.

How Are Water Slides Made: Concept, Design and Engineering Breakdown

The NO.1 Water Park Equipment Company In China

When designing a water park, how to attract young crowds

How to Design and Build a Water Theme Park

What Is a Wave Maker? Complete Guide to Wave Machines for Water Parks in 2025
FAQs
How long does it usually take for WM International's water park design projects to be completed?
The project cycle varies depending on the project size, design complexity and customer needs. Generally speaking, the complete planning and design process usually takes 2-6 months. We will confirm the schedule with the customer at the beginning of the project and ensure that the design work is completed on time.
How to start working with WM International for water park project design?
You can contact us through our official website contact form or call our customer service team directly. We will conduct initial communication based on your needs, arrange project surveys and analysis, develop personalized design plans, and provide detailed service processes and quotations.
What are the main contents of water park planning and design services?
We provide a full range of water park planning and design services, including site analysis, theme setting, facility layout, visitor flow design, safety and environmental protection design, etc. Our goal is to create a safe and entertaining water park through scientific planning and creative design to enhance the visitor experience.
Does WM International provide post-operation and maintenance support for the water park?
Yes, we not only provide design and construction services, but also provide operation and maintenance support for the water park. We can provide equipment maintenance, regular inspections and optimization suggestions according to customer needs to ensure the long-term efficient and safe operation of the park.
What are the advantages of WM International's design team?
Our design team has rich project experience in planning, landscape, architecture, structure, equipment and other fields. The team members include many senior experts at home and abroad to ensure that each project can combine the latest technology and design concepts in the industry to provide the best solutions.

Time Tunnel Water Slide

Children Combined Water Slide

Huge Bowl Water Slide

Group Water Slides

Small King Cobra Water Slide

Big Tourbillion Water Slide
Get in touch
Have to get customized water park solutions and product quotes.
We will provide you with professional consultation and support.
wmwaterslide
wmwaterpark