How should water park industry develop continuously and healthily

Second, to strengthen the water park talent training and construction, which is closely related to the improvement of the competitiveness of the industry. On the one hand, the training of existing water park talents should be strengthened, including the training of management, technology, and service talents. On the other hand, we should pay attention to the cultivation of talents. We can cooperate with many colleges and universities offering tourism majors in China to integrate the relevant business knowledge of water parks into the curriculum system of scenic spot management and product specialty so as to train the characteristic professional talents by order.
Thirdly, as a special industry, safety is crucial to the healthy development of the water park industry. Therefore, it is necessary to establish the safety management system of the water park, especially the equipment safety and service safety of the water park. At the same time, it is necessary to fully respond to the diversified and comprehensive consumption demands of tourists, improve the service content of water parks through scale expansion or cooperation, and extend the upstream and downstream service value chain of water entertainment.

How Are Water Slides Made: Concept, Design and Engineering Breakdown

The NO.1 Water Park Equipment Company In China

When designing a water park, how to attract young crowds

How to Design and Build a Water Theme Park

What Is a Wave Maker? Complete Guide to Wave Machines for Water Parks in 2025
FAQs
What are the advantages of WM International's design team?
Our design team has rich project experience in planning, landscape, architecture, structure, equipment and other fields. The team members include many senior experts at home and abroad to ensure that each project can combine the latest technology and design concepts in the industry to provide the best solutions.
How to start working with WM International for water park project design?
You can contact us through our official website contact form or call our customer service team directly. We will conduct initial communication based on your needs, arrange project surveys and analysis, develop personalized design plans, and provide detailed service processes and quotations.
Does WM International provide post-operation and maintenance support for the water park?
Yes, we not only provide design and construction services, but also provide operation and maintenance support for the water park. We can provide equipment maintenance, regular inspections and optimization suggestions according to customer needs to ensure the long-term efficient and safe operation of the park.
What are the main contents of water park planning and design services?
We provide a full range of water park planning and design services, including site analysis, theme setting, facility layout, visitor flow design, safety and environmental protection design, etc. Our goal is to create a safe and entertaining water park through scientific planning and creative design to enhance the visitor experience.
How long does it usually take for WM International's water park design projects to be completed?
The project cycle varies depending on the project size, design complexity and customer needs. Generally speaking, the complete planning and design process usually takes 2-6 months. We will confirm the schedule with the customer at the beginning of the project and ensure that the design work is completed on time.

Time Tunnel Water Slide

Children Combined Water Slide

Huge Bowl Water Slide

Group Water Slides

Small King Cobra Water Slide

Big Tourbillion Water Slide
Get in touch
Have to get customized water park solutions and product quotes.
We will provide you with professional consultation and support.
wmwaterslide
wmwaterpark