What are the differences between flow-through and recirculating water systems in spray parks? | WM INTERNATIONAL Guide

2025-05-28
Compare flow-through and recirculating water systems in spray parks. Learn operational costs, water use, regulations, and safety benefits for informed decision-making.

# What are the Differences Between Flow-Through and Recirculating Water Systems in Spray Parks?

Spray park operators face a key decision between flow-through and recirculating water systems. Selecting the right system impacts operational costs, water sustainability, health compliance, and environmental responsibility. This article details the distinctions using industry standards and authoritative data for water park professionals.

Understanding Flow-Through Water Systems

What are Flow-Through Water Systems?

- Water is supplied directly from the municipal source.

- After use in spray features, water is drained away—usually to the sewer.

- No filtration, disinfection, or reuse of water occurs on-site.

Advantages

- Low Maintenance: Fewer moving parts and no need for in-park water treatment.

- Straightforward Operations: Simplifies staff training and management.

- Lower Initial Cost: Equipment and infrastructure are less complex.

Disadvantages

- Higher Water Consumption: Can use thousands of gallons per day in busy parks ((https://www.epa.gov/sites/production/files/2017-01/documents/watersensecommercia_final508.pdf)).

- Less Environmentally Friendly: No water reuse, increasing environmental footprint.

- Potential Regulatory Challenges: Growing concerns over municipal water usage and sustainability.

Understanding Recirculating Water Systems

What are Recirculating Water Systems?

- Water is collected after feature use, filtered, disinfected (often with chlorine or UV), and reused in the spray park.

- Features a closed-loop system with pumps and treatment equipment.

Advantages

- Water Conservation: Reuses water, using up to 90% less than flow-through systems ((https://www.cdc.gov/healthywater/swimming/aquatics-professionals/operation-water-playgrounds.html)).

- Better Sustainability: Supports LEED and global sustainability goals.

- Regulatory Compliance: In many regions, new regulations favor or mandate recirculating systems.

- Health Safety: Advanced filtration and disinfection can reduce pathogen risks if maintained properly.

Disadvantages

- Higher Initial Investment: Equipment and system installation require significant capital.

- Ongoing Maintenance Needs: Regular monitoring, chemical treatment, and equipment service are critical.

- Complex Operation: Staff must be trained in water quality testing and system management.

Key Factors for Choosing the Right System

Regulatory Considerations

- Regulations differ globally and locally. Some areas now mandate recirculating systems for any interactive water play ((https://www.nspf.org/)).

- Check local codes for compliance before designing or updating spray parks.

Operational Cost Impact

- Flow-through: Lower up-front costs, higher long-term water bills.

- Recirculating: Higher up-front costs, potentially lower operating expenses due to water savings.

Health and Safety

- Flow-through may pose less risk if municipal water is always treated.

- Recirculating systems require strict health monitoring, but offer advanced pathogen control if managed well.

Environmental Sustainability

- Recirculating systems are preferred for water conservation, especially in drought-prone or water-scarce areas.

Conclusion

Choosing between flow-through and recirculating water systems in spray parks requires a holistic view of operational goals, regulatory demands, environmental stewardship, and guest safety. Carefully weigh the differences to maximize your park's performance and public responsibility.

For more water park design insights or specific guidance, contact WM INTERNATIONAL—industry experts in sustainable aquatic facility solutions.

Recommended for you
wave making machine - WM INTERNATIONAL

What Is a Wave Maker? Complete Guide to Wave Machines for Water Parks in 2025

What Is a Wave Maker? Complete Guide to Wave Machines for Water Parks in 2025
Water Park Slide cost - WM INTERNATIONAL

Water Park Construction Planning: Key Considerations

Water Park Construction Planning: Key Considerations
Natrix & Magic Ball Slide - WM INTERNATIONAL

What Material Are Water Slides Made From? Ultimate Guide in 2025

What Material Are Water Slides Made From? Ultimate Guide in 2025
water park equipment - WM INTERNATIONAL

How to Upgrade and Renovate a Water Park

How to Upgrade and Renovate a Water Park
water park manufacturer - WM INTERNATIONAL

How to Consider Facility Durability When Building a Water Park

How to Consider Facility Durability When Building a Water Park
Prdoucts Categories
FAQ
FAQs
What are the advantages of WM International's design team?

Our design team has rich project experience in planning, landscape, architecture, structure, equipment and other fields. The team members include many senior experts at home and abroad to ensure that each project can combine the latest technology and design concepts in the industry to provide the best solutions.

How to start working with WM International for water park project design?

You can contact us through our official website contact form or call our customer service team directly. We will conduct initial communication based on your needs, arrange project surveys and analysis, develop personalized design plans, and provide detailed service processes and quotations.

Does WM International provide post-operation and maintenance support for the water park?

Yes, we not only provide design and construction services, but also provide operation and maintenance support for the water park. We can provide equipment maintenance, regular inspections and optimization suggestions according to customer needs to ensure the long-term efficient and safe operation of the park.

How long does it usually take for WM International's water park design projects to be completed?

The project cycle varies depending on the project size, design complexity and customer needs. Generally speaking, the complete planning and design process usually takes 2-6 months. We will confirm the schedule with the customer at the beginning of the project and ensure that the design work is completed on time.

What are the main contents of water park planning and design services?

We provide a full range of water park planning and design services, including site analysis, theme setting, facility layout, visitor flow design, safety and environmental protection design, etc. Our goal is to create a safe and entertaining water park through scientific planning and creative design to enhance the visitor experience.

You may also like
Time Tunnel Slide - WM INTERNATIONAL

Time Tunnel Water Slide

Time Tunnel Water Slide
Kids Mountain Slide - WM INTERNATIONAL

Children Combined Water Slide

Children Combined Water Slide
Huge bowl slide - WM INTERNATIONAL

Huge Bowl Water Slide

Huge Bowl Water Slide
Overtune Slides - WM INTERNATIONAL

Group Water Slides

Group Water Slides
Small King Cobra Slide - WM INTERNATIONAL

Small King Cobra Water Slide

Small King Cobra Water Slide
Big Tourbillion Slide - WM INTERNATIONAL

Big Tourbillion Water Slide

Big Tourbillion Water Slide

Get in touch

  Have to get customized water park solutions and product quotes.

We will provide you with professional consultation and support.

Please enter your name not exceed 100 characters
The email format is not correct or exceed 100 characters, Please reenter!
Please enter a valid phone number!
Please enter your field_780 not exceed 150 characters
Please enter your content not exceed 500 characters
Contact customer service
  • WeChat
    Scan QR Code

How can we help?

Hi,

If you are interested in our products solution services or have any questions, please let us know so that we can better assist you.

×
Please enter your name not exceed 100 characters
The email format is not correct or exceed 100 characters, Please reenter!
Please enter a valid phone number!
Please enter your field_780 not exceed 150 characters
Please enter your content not exceed 500 characters