Winter is coming, how should water park equipment maintain

1. For the water park equipment and facilities not used in winter, water should be drained to prevent ice from causing damage to the equipment and facilities. For the water park facilities that need to be used in winter, to prevent icing, you can't let the temperature fall below 0 degrees; the practical method is stirring equipment. Regularly stir the water; do not let the water freeze.
2. maintenance of water water slide equipment The slide is generally made of fiberglass and is waxed at least twice a year. Before waxing, polish and beautify the black spots and discoloration on the slide surface. Polishing and waxing can well protect the surface of the water slide equipment, which is not prone to rust and damage. When the park is closed in winter, cover exposed equipment with rainproof shading cloth to prevent corrosion caused by ultraviolet rays and wind and rain.
3. Maintenance of wave-making pools and river rafting facilities. In winter, when the temperature is low, the volume of water freezing will increase, and the ice will squeeze the wall of the wave-making pool and the drifting river wall and also cause some damage to the external pipeline. Therefore, the water should be treated with radiation.

How Are Water Slides Made: Concept, Design and Engineering Breakdown

The NO.1 Water Park Equipment Company In China

When designing a water park, how to attract young crowds

How to Design and Build a Water Theme Park

What Is a Wave Maker? Complete Guide to Wave Machines for Water Parks in 2025
FAQs
How long does it usually take for WM International's water park design projects to be completed?
The project cycle varies depending on the project size, design complexity and customer needs. Generally speaking, the complete planning and design process usually takes 2-6 months. We will confirm the schedule with the customer at the beginning of the project and ensure that the design work is completed on time.
What are the advantages of WM International's design team?
Our design team has rich project experience in planning, landscape, architecture, structure, equipment and other fields. The team members include many senior experts at home and abroad to ensure that each project can combine the latest technology and design concepts in the industry to provide the best solutions.
Does WM International provide post-operation and maintenance support for the water park?
Yes, we not only provide design and construction services, but also provide operation and maintenance support for the water park. We can provide equipment maintenance, regular inspections and optimization suggestions according to customer needs to ensure the long-term efficient and safe operation of the park.
What are the main contents of water park planning and design services?
We provide a full range of water park planning and design services, including site analysis, theme setting, facility layout, visitor flow design, safety and environmental protection design, etc. Our goal is to create a safe and entertaining water park through scientific planning and creative design to enhance the visitor experience.
How to start working with WM International for water park project design?
You can contact us through our official website contact form or call our customer service team directly. We will conduct initial communication based on your needs, arrange project surveys and analysis, develop personalized design plans, and provide detailed service processes and quotations.

Time Tunnel Water Slide

Children Combined Water Slide

Huge Bowl Water Slide

Group Water Slides

Small King Cobra Water Slide

Big Tourbillion Water Slide
Get in touch
Have to get customized water park solutions and product quotes.
We will provide you with professional consultation and support.
wmwaterslide
wmwaterpark