What Are the Precautions to Take When Operating Water Park Facilities
Precautions for operating water amusement park equipment and facilities
Most indoor water park facilities are for children to play, so we must pay attention to all aspects when installing water amusement park equipment to ensure the safety of children.
1. No sharp edges, corners, or burrs are allowed to leak outside. For safety reasons, wherever passengers can touch water amusement park equipment facilities for children, no dangerous protruding objects such as sharp edges, corners, burrs, etc. are allowed to leak outside to avoid hurting children.
2. Set up safety fences. Safety fences are set up at the entrance and exit, respectively. A guiding fence should be set up at the entrance. The opening direction of the safety fence should be consistent with the direction of passenger travel (except for special circumstances). To prevent hand injury to personnel when closing the door, the gap between the door frame and the pillar should be appropriate or other protective measures should be taken.
3. The platform should have anti-skid measures.
4. For amusement facilities that run up and down while passengers are boarding and disembarking, the entrance and exit of the boarding part should not be more than 300mm higher than the platform. The height of the entrance and exit of other amusement facilities should be convenient for boarding and disembarking.

How Are Water Slides Made: Concept, Design and Engineering Breakdown

The NO.1 Water Park Equipment Company In China

When designing a water park, how to attract young crowds

How to Design and Build a Water Theme Park

What Is a Wave Maker? Complete Guide to Wave Machines for Water Parks in 2025
FAQs
How to start working with WM International for water park project design?
You can contact us through our official website contact form or call our customer service team directly. We will conduct initial communication based on your needs, arrange project surveys and analysis, develop personalized design plans, and provide detailed service processes and quotations.
How long does it usually take for WM International's water park design projects to be completed?
The project cycle varies depending on the project size, design complexity and customer needs. Generally speaking, the complete planning and design process usually takes 2-6 months. We will confirm the schedule with the customer at the beginning of the project and ensure that the design work is completed on time.
Does WM International provide post-operation and maintenance support for the water park?
Yes, we not only provide design and construction services, but also provide operation and maintenance support for the water park. We can provide equipment maintenance, regular inspections and optimization suggestions according to customer needs to ensure the long-term efficient and safe operation of the park.
What are the main contents of water park planning and design services?
We provide a full range of water park planning and design services, including site analysis, theme setting, facility layout, visitor flow design, safety and environmental protection design, etc. Our goal is to create a safe and entertaining water park through scientific planning and creative design to enhance the visitor experience.
What are the advantages of WM International's design team?
Our design team has rich project experience in planning, landscape, architecture, structure, equipment and other fields. The team members include many senior experts at home and abroad to ensure that each project can combine the latest technology and design concepts in the industry to provide the best solutions.

Time Tunnel Water Slide

Children Combined Water Slide

Huge Bowl Water Slide

Group Water Slides

Small King Cobra Water Slide

Big Tourbillion Water Slide
Get in touch
Have to get customized water park solutions and product quotes.
We will provide you with professional consultation and support.
wmwaterslide
wmwaterpark