Building a water park is a complex, systematic project requiring meticulous planning, professional design, and strict construction. It can be divided into several key stages:

Building a water park is a complex, systematic project requiring meticulous planning, professional design, and strict construction. It can be divided into several key stages:

 

Phase 1: Pre-Planning & Feasibility Study

Market Research & Concept Development:

Analyze the target market.

Determine the park's theme, positioning, and target audience.

Conceptualize core attractions and unique selling points.

Site Selection & Evaluation:

Investigate land location, accessibility, topography, geological conditions, hydrology, environmental impact, and infrastructure availability.

Assess land cost, development constraints, and policy regulations.

 

Phase 2: Water Park Design & Planning

Master Planning & Concept Design:

Define the park's overall layout and functional zones (Entrance Area, Wave Pool Area, Slide Complex, Children's Area, Relaxation Zone, F&B/Retail Area, Backstage/Operations Area, etc.).

Design primary guest flow/circulation paths.

Determine preliminary locations and scale of core water features (slide types, wave pool, lazy river, children's water play structure, etc.).

Develop conceptual renderings and site plans.

 

Phase 3: Water Park Construction

Infrastructure Construction:

Roads and underground utility networks.

Main Structure Construction:

Building civil works (structures).

Pool Structure Construction: This is core. Strictly build pool structures (swimming pools, wave pools, lazy rivers, slide plunge pools, etc.) according to drawings, ensuring waterproofing and leak prevention.

Construction of slide support structures and towers.

 

Phase 4: Water Ride Installation & Commissioning

Ride Equipment Installation:

Professional slide suppliers install slide bodies, conveyance systems (lifts), and control systems.

Install wave machines, water cannons, interactive features, etc.

Install lazy river propulsion pumps, water treatment injection points, etc.

 

 

 

 

Recommended for you
How Are Water Slides Made - WM INTERNATIONAL

How Are Water Slides Made: Concept, Design and Engineering Breakdown

How Are Water Slides Made: Concept, Design and Engineering Breakdown
water park slides for sale - WM INTERNATIONAL

The NO.1 Water Park Equipment Company In China

The NO.1 Water Park Equipment Company In China
Abyss & Flying Carpet Slide - WM INTERNATIONAL

When designing a water park, how to attract young crowds

When designing a water park, how to attract young crowds
1753165892705 - WM INTERNATIONAL

How to Design and Build a Water Theme Park

How to Design and Build a Water Theme Park
wave making machine - WM INTERNATIONAL

What Is a Wave Maker? Complete Guide to Wave Machines for Water Parks in 2025

What Is a Wave Maker? Complete Guide to Wave Machines for Water Parks in 2025
Prdoucts Categories
FAQ
FAQs
How to start working with WM International for water park project design?

You can contact us through our official website contact form or call our customer service team directly. We will conduct initial communication based on your needs, arrange project surveys and analysis, develop personalized design plans, and provide detailed service processes and quotations.

How long does it usually take for WM International's water park design projects to be completed?

The project cycle varies depending on the project size, design complexity and customer needs. Generally speaking, the complete planning and design process usually takes 2-6 months. We will confirm the schedule with the customer at the beginning of the project and ensure that the design work is completed on time.

Does WM International provide post-operation and maintenance support for the water park?

Yes, we not only provide design and construction services, but also provide operation and maintenance support for the water park. We can provide equipment maintenance, regular inspections and optimization suggestions according to customer needs to ensure the long-term efficient and safe operation of the park.

What are the advantages of WM International's design team?

Our design team has rich project experience in planning, landscape, architecture, structure, equipment and other fields. The team members include many senior experts at home and abroad to ensure that each project can combine the latest technology and design concepts in the industry to provide the best solutions.

What are the main contents of water park planning and design services?

We provide a full range of water park planning and design services, including site analysis, theme setting, facility layout, visitor flow design, safety and environmental protection design, etc. Our goal is to create a safe and entertaining water park through scientific planning and creative design to enhance the visitor experience.

You may also like
Time Tunnel Slide - WM INTERNATIONAL

Time Tunnel Water Slide

Time Tunnel Water Slide
Kids Mountain Slide - WM INTERNATIONAL

Children Combined Water Slide

Children Combined Water Slide
Huge bowl slide - WM INTERNATIONAL

Huge Bowl Water Slide

Huge Bowl Water Slide
Overtune Slides - WM INTERNATIONAL

Group Water Slides

Group Water Slides
Small King Cobra Slide - WM INTERNATIONAL

Small King Cobra Water Slide

Small King Cobra Water Slide
Big Tourbillion Slide - WM INTERNATIONAL

Big Tourbillion Water Slide

Big Tourbillion Water Slide

Get in touch

  Have to get customized water park solutions and product quotes.

We will provide you with professional consultation and support.

Please enter your name not exceed 100 characters
The email format is not correct or exceed 100 characters, Please reenter!
Please enter a valid phone number!
Please enter your field_780 not exceed 150 characters
Please enter your content not exceed 500 characters
Contact customer service
  • WeChat
    Scan QR Code

How can we help?

Hi,

If you are interested in our products solution services or have any questions, please let us know so that we can better assist you.

×
Please enter your name not exceed 100 characters
The email format is not correct or exceed 100 characters, Please reenter!
Please enter a valid phone number!
Please enter your field_780 not exceed 150 characters
Please enter your content not exceed 500 characters