High Speed Water Slides | WM INTERNATIONAL
High Speed Water Slides: The Ultimate Thrill
Dive into the excitement with WM INTERNATIONAL's high speed water slides. Designed to provide an adrenaline rush, these slides are perfect for water parks looking to attract thrill-seekers. Our slides combine safety with speed, ensuring a memorable experience for all guests.
Innovative Design and Engineering
At WM INTERNATIONAL, we leverage our 19 years of industry experience to create high speed water slides that are both innovative and safe. Our design team works closely with clients to tailor each slide to the specific needs of their park, ensuring a perfect fit and maximum enjoyment. Our modern production base, spanning 100,000 m², is the largest in the industry, allowing us to produce high-quality slides efficiently.
Comprehensive Service Solutions
From planning and design to manufacturing, installation, and maintenance, WM INTERNATIONAL offers a full range of services for your water park. Our high speed water slides are just one part of our comprehensive solutions that transform your park vision into reality. Whether you're developing a new park or upgrading an existing one, our expertise as park operators, designers, suppliers, and guests ensures world-class attractions.
Tailor-Made for Your Park
Each high speed water slide project we undertake reflects our professional capabilities. We provide tailor-made solutions based on different customer needs and site characteristics. With WM INTERNATIONAL, you get more than just a slide; you get a partner committed to enhancing your park's appeal and success.
High Speed Water Slide Display
What are the main contents of water park planning and design services?
We provide a full range of water park planning and design services, including site analysis, theme setting, facility layout, visitor flow design, safety and environmental protection design, etc. Our goal is to create a safe and entertaining water park through scientific planning and creative design to enhance the visitor experience.
What are the advantages of WM International's design team?
Our design team has rich project experience in planning, landscape, architecture, structure, equipment and other fields. The team members include many senior experts at home and abroad to ensure that each project can combine the latest technology and design concepts in the industry to provide the best solutions.
Does WM International provide post-operation and maintenance support for the water park?
Yes, we not only provide design and construction services, but also provide operation and maintenance support for the water park. We can provide equipment maintenance, regular inspections and optimization suggestions according to customer needs to ensure the long-term efficient and safe operation of the park.
How to start working with WM International for water park project design?
You can contact us through our official website contact form or call our customer service team directly. We will conduct initial communication based on your needs, arrange project surveys and analysis, develop personalized design plans, and provide detailed service processes and quotations.
How long does it usually take for WM International's water park design projects to be completed?
The project cycle varies depending on the project size, design complexity and customer needs. Generally speaking, the complete planning and design process usually takes 2-6 months. We will confirm the schedule with the customer at the beginning of the project and ensure that the design work is completed on time.
What Material Are Water Slides Made From? Ultimate Guide in 2025
Discover what material water slides are made from in our Guide 2025 by WM INTERNATIONAL. Learn about the best waterslide material options, ensuring durability and safety for every splash. Stay informed with expert insights tailored for water slide enthusiasts and professionals.
How to Upgrade and Renovate a Water Park
Water park equipment upgrades are a comprehensive process aimed at enhancing visitor experiences, improving operational efficiency, strengthening safety, and achieving sustainable development. Key steps and considerations include:
How to Consider Facility Durability When Building a Water Park
When building a water park, considering the durability of the facilities is crucial to ensure long-term safe operation and reduce maintenance costs. The following are key strategies aimed at enhancing the durability of water park facilities:
wmwaterslide
wmwaterpark