How to choose the equipment of small water park

2. Make rational decisions and invest rationally. The more the water park equipment is, the better; the bigger the better; the more expensive the better. So in the equipment selection decision process, to keep rational, according to the investment budget, choose the appropriate equipment manufacturers and cost-effective equipment; do not buy.
3. Highlight highlights and combine them scientifically. Industry competition is fierce; blindly following the trend and piling up equipment without their own characteristics, highlights, or disorderly combination, then, the attraction of this water park, vitality is bound to be limited.

How Are Water Slides Made: Concept, Design and Engineering Breakdown

The NO.1 Water Park Equipment Company In China

When designing a water park, how to attract young crowds

How to Design and Build a Water Theme Park

What Is a Wave Maker? Complete Guide to Wave Machines for Water Parks in 2025
FAQs
How to start working with WM International for water park project design?
You can contact us through our official website contact form or call our customer service team directly. We will conduct initial communication based on your needs, arrange project surveys and analysis, develop personalized design plans, and provide detailed service processes and quotations.
What are the main contents of water park planning and design services?
We provide a full range of water park planning and design services, including site analysis, theme setting, facility layout, visitor flow design, safety and environmental protection design, etc. Our goal is to create a safe and entertaining water park through scientific planning and creative design to enhance the visitor experience.
Does WM International provide post-operation and maintenance support for the water park?
Yes, we not only provide design and construction services, but also provide operation and maintenance support for the water park. We can provide equipment maintenance, regular inspections and optimization suggestions according to customer needs to ensure the long-term efficient and safe operation of the park.
How long does it usually take for WM International's water park design projects to be completed?
The project cycle varies depending on the project size, design complexity and customer needs. Generally speaking, the complete planning and design process usually takes 2-6 months. We will confirm the schedule with the customer at the beginning of the project and ensure that the design work is completed on time.
What are the advantages of WM International's design team?
Our design team has rich project experience in planning, landscape, architecture, structure, equipment and other fields. The team members include many senior experts at home and abroad to ensure that each project can combine the latest technology and design concepts in the industry to provide the best solutions.

Time Tunnel Water Slide

Children Combined Water Slide

Huge Bowl Water Slide

Group Water Slides

Small King Cobra Water Slide

Big Tourbillion Water Slide
Get in touch
Have to get customized water park solutions and product quotes.
We will provide you with professional consultation and support.
wmwaterslide
wmwaterpark