How should a water park be fully renovated and upgraded to meet the development needs

2. Combination of high-quality products. Traditional water park products are only water entertainment items; the competitive advantage can be from the product mix. The combination of traditional products, such as water slides, indoor family amusement, oceanariums, and performance activities, is suitable for people at all levels of families.
3. Increase secondary consumption. Second consumption is easy to say but not easy to do. The focus is on the planning of the operation points in the park. According to the flow of customers and flow planning, catering, shopping, performing arts, stalls, and other secondary consumer businesses.
4. Provide good management services. Water parks in third- and fourth-tier cities are generally poorly managed with backward service consciousness. In order to win in the fierce market competition, we should have a professional operation and management team, and good service is also a very effective means.

How Are Water Slides Made: Concept, Design and Engineering Breakdown

The NO.1 Water Park Equipment Company In China

When designing a water park, how to attract young crowds

How to Design and Build a Water Theme Park

What Is a Wave Maker? Complete Guide to Wave Machines for Water Parks in 2025
FAQs
What are the main contents of water park planning and design services?
We provide a full range of water park planning and design services, including site analysis, theme setting, facility layout, visitor flow design, safety and environmental protection design, etc. Our goal is to create a safe and entertaining water park through scientific planning and creative design to enhance the visitor experience.
How long does it usually take for WM International's water park design projects to be completed?
The project cycle varies depending on the project size, design complexity and customer needs. Generally speaking, the complete planning and design process usually takes 2-6 months. We will confirm the schedule with the customer at the beginning of the project and ensure that the design work is completed on time.
What are the advantages of WM International's design team?
Our design team has rich project experience in planning, landscape, architecture, structure, equipment and other fields. The team members include many senior experts at home and abroad to ensure that each project can combine the latest technology and design concepts in the industry to provide the best solutions.
Does WM International provide post-operation and maintenance support for the water park?
Yes, we not only provide design and construction services, but also provide operation and maintenance support for the water park. We can provide equipment maintenance, regular inspections and optimization suggestions according to customer needs to ensure the long-term efficient and safe operation of the park.
How to start working with WM International for water park project design?
You can contact us through our official website contact form or call our customer service team directly. We will conduct initial communication based on your needs, arrange project surveys and analysis, develop personalized design plans, and provide detailed service processes and quotations.

Time Tunnel Water Slide

Children Combined Water Slide

Huge Bowl Water Slide

Group Water Slides

Small King Cobra Water Slide

Big Tourbillion Water Slide
Get in touch
Have to get customized water park solutions and product quotes.
We will provide you with professional consultation and support.
wmwaterslide
wmwaterpark