Choice of Two Development Models for Water Parks
Hot summers make people more inclined to various water-related playgrounds. The emergence of water park projects satisfies this need and can be said to be a work of art in summer scenic spots.
So for investors of water park projects, which model should the water park choose to develop? Based on years of experience, we have come up with two development models that are more suitable for water park projects at this stage.
1. select the development mode from the perspective of the operation mode of the water park project
From an operating mode standpoint, there are two options for operating a single water park independently and a non-independent operating auxiliary water park.
Relatively speaking, independently operating a water park is more suitable for large tourist attractions where multiple projects gather, such as tourist complexes and large resorts. As one of the core projects of tourist attractions, the water park project is relatively large in scale, with many products and water slides. Facilities and stand-alone systems that can be operated independently. Non-independently operated supporting water parks are suitable for small and medium tourist attractions, amusement parks, theme parks (such as Sea World), resort hotels, real estate communities, etc. The water park does not need to operate independently; it is only used as a support project.
2. select the development method from the perspective of the cultural connotation and landscape characteristics of the water park project
From the perspective of cultural content and landscape characteristics, there are two types of theme water park projects: non-theme water parks and traditional water parks.
Theme water parks are an advanced form of water park project development. It takes water as the core and, based on a specific cultural theme, combines water park equipment , landscapes, and activities and uses scientific technology and methods to form theme-themed playground scenery and activities.
A modern playground with water entertainment, leisure facilities, and services. Compared with traditional water parks, the difference between the two is mainly reflected in whether there is a theme culture embedded and operated in landscape, equipment, operation, etc.
The key to investing in a theme water park is to grasp the relationship with attractions, especially in terms of site selection and interaction with attractions. The combination of themed and creative activities, creative landscape, and flexible marketing strategies is the key to the success of the theme water park project.

How Are Water Slides Made: Concept, Design and Engineering Breakdown

The NO.1 Water Park Equipment Company In China

When designing a water park, how to attract young crowds

How to Design and Build a Water Theme Park

What Is a Wave Maker? Complete Guide to Wave Machines for Water Parks in 2025
FAQs
What are the main contents of water park planning and design services?
We provide a full range of water park planning and design services, including site analysis, theme setting, facility layout, visitor flow design, safety and environmental protection design, etc. Our goal is to create a safe and entertaining water park through scientific planning and creative design to enhance the visitor experience.
Does WM International provide post-operation and maintenance support for the water park?
Yes, we not only provide design and construction services, but also provide operation and maintenance support for the water park. We can provide equipment maintenance, regular inspections and optimization suggestions according to customer needs to ensure the long-term efficient and safe operation of the park.
What are the advantages of WM International's design team?
Our design team has rich project experience in planning, landscape, architecture, structure, equipment and other fields. The team members include many senior experts at home and abroad to ensure that each project can combine the latest technology and design concepts in the industry to provide the best solutions.
How long does it usually take for WM International's water park design projects to be completed?
The project cycle varies depending on the project size, design complexity and customer needs. Generally speaking, the complete planning and design process usually takes 2-6 months. We will confirm the schedule with the customer at the beginning of the project and ensure that the design work is completed on time.
How to start working with WM International for water park project design?
You can contact us through our official website contact form or call our customer service team directly. We will conduct initial communication based on your needs, arrange project surveys and analysis, develop personalized design plans, and provide detailed service processes and quotations.

Time Tunnel Water Slide

Children Combined Water Slide

Huge Bowl Water Slide

Group Water Slides

Small King Cobra Water Slide

Big Tourbillion Water Slide
Get in touch
Have to get customized water park solutions and product quotes.
We will provide you with professional consultation and support.
wmwaterslide
wmwaterpark