Are maintenance plans included in WM’s project services? | WM INTERNATIONAL Guide
Are Maintenance Plans Included in WM’s Project Services?
Understanding if maintenance plans are included in WM’s project services is essential for water park professionals planning new projects or renovating existing facilities. Efficient maintenance ensures safety, reduces downtime, and optimizes operational costs—top pain points for water park operators worldwide.
What Are Project Services?
- Definition:
Project services refer to the comprehensive support provided during water park planning, design, construction, and commissioning.
- Key Offerings:
- Initial consultation and feasibility studies
- Concept and schematic design
- Engineering and construction management
- Installation of attractions and systems
Are Maintenance Plans Included?
- Standard Inclusions:
- WM typically provides initial training and operational manuals upon project completion.
- Maintenance guidelines are part of the handover documents, ensuring safe equipment operation.
- Customizable Maintenance Plans:
- WM offers tailored maintenance programs as an optional, value-added service.
- Service agreements can cover routine inspections, preventive maintenance, and emergency repairs.
- Benefits for Operators:
- Reduces risk of unplanned downtime and costly repairs
- Extends asset life and compliance with international safety standards (source: IAAPA )
- Quick access to certified technicians familiar with WM systems
Key Features of WM Maintenance Plans
- Preventive Inspections:
Regular on-site assessments of critical infrastructure, slides, pumps, and water treatment systems.
- Scheduled Servicing:
Pre-planned maintenance schedules to minimize disruption and maximize safety.
- Spare Parts Management:
Streamlined supply chain for essential parts and consumables, reducing lead times.
- Technical Support:
24/7 helpline and on-site support when required, ensuring fast response during emergencies.
Industry Best Practices
- Why Ongoing Maintenance Matters:
- Water parks face strict operational and safety compliance requirements.
- According to ASTM F2376, ongoing maintenance is critical for the safe operation of water slides and aquatic attractions.
- WM’s Approach:
- Aligns with international best practices and local regulations.
- Provides maintenance as an integrated part of long-term project partnerships.
How to Request a Maintenance Plan
- Contact Process:
- Reach out during the project planning phase to discuss maintenance options.
- WM’s specialists customize plans based on project size, location, attraction mix, and budget.
- After-Sales Support:
- Ongoing advisory and refresher training available post-launch.
Summary Points
- Maintenance plans are an optional, customizable part of WM’s project services.
- Plans provide ongoing safety, efficiency, and compliance for water park professionals.
- Contact WM early to tailor a maintenance solution to your park’s unique needs.
Authoritative Source:
- IAAPA: International Association of Amusement Parks and Attractions ((https://www.iaapa.org))
- ASTM International Safety Standards ((https://www.astm.org/Standards/F2376.htm))

How Are Water Slides Made: Concept, Design and Engineering Breakdown

The NO.1 Water Park Equipment Company In China

When designing a water park, how to attract young crowds

How to Design and Build a Water Theme Park

What Is a Wave Maker? Complete Guide to Wave Machines for Water Parks in 2025
FAQs
What are the advantages of WM International's design team?
Our design team has rich project experience in planning, landscape, architecture, structure, equipment and other fields. The team members include many senior experts at home and abroad to ensure that each project can combine the latest technology and design concepts in the industry to provide the best solutions.
Does WM International provide post-operation and maintenance support for the water park?
Yes, we not only provide design and construction services, but also provide operation and maintenance support for the water park. We can provide equipment maintenance, regular inspections and optimization suggestions according to customer needs to ensure the long-term efficient and safe operation of the park.
What are the main contents of water park planning and design services?
We provide a full range of water park planning and design services, including site analysis, theme setting, facility layout, visitor flow design, safety and environmental protection design, etc. Our goal is to create a safe and entertaining water park through scientific planning and creative design to enhance the visitor experience.
How long does it usually take for WM International's water park design projects to be completed?
The project cycle varies depending on the project size, design complexity and customer needs. Generally speaking, the complete planning and design process usually takes 2-6 months. We will confirm the schedule with the customer at the beginning of the project and ensure that the design work is completed on time.
How to start working with WM International for water park project design?
You can contact us through our official website contact form or call our customer service team directly. We will conduct initial communication based on your needs, arrange project surveys and analysis, develop personalized design plans, and provide detailed service processes and quotations.

Time Tunnel Water Slide

Children Combined Water Slide

Huge Bowl Water Slide

Group Water Slides

Small King Cobra Water Slide

Big Tourbillion Water Slide
Get in touch
Have to get customized water park solutions and product quotes.
We will provide you with professional consultation and support.
wmwaterslide
wmwaterpark